Rincian Produk
Tempat asal: CINA
Nama merek: Hengcheng
Sertifikasi: ISO Patent Certificate High-Tech Product Certificate
Nomor model: HVM1700 HVM1900 HVM2200 HVM2400 HVM2800 HVM3400 HVM3700 HVM4200
Ketentuan Pembayaran & Pengiriman
Kuantitas min Order: 1 Set
Harga: Bisa dinegosiasikan
Kemasan rincian: Kemasan Pengiriman Standar
Waktu pengiriman: 120 hari
Syarat-syarat pembayaran: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Menyediakan kemampuan: 5 set/bulan
Nama Produk: |
Pabrik Vertikal Gypsum |
Efisiensi Penggilingan (kg/kWh): |
25-30kg/kWh |
Menyerahkan kehalusan: |
200-325 mesh (rentang yang dapat disesuaikan) |
Daya Motor Utama: |
550 - 5000kW |
Kadar Air Gipsum Mentah: |
≤10% |
Kadar Air Produk: |
≤0,5% |
Area Aplikasi: |
Desulfurisasi, Metalurgi, Industri Kimia, Kekuasaan, Energi Baru |
Instalasi: |
Panduan Insinyur |
Peringkat Daya (kW): |
110-400kW |
Bahan yang cocok: |
Gipsum Alami、FGD Gipsum、Phosphogypsum、Citrogypsum |
Nama Produk: |
Pabrik Vertikal Gypsum |
Efisiensi Penggilingan (kg/kWh): |
25-30kg/kWh |
Menyerahkan kehalusan: |
200-325 mesh (rentang yang dapat disesuaikan) |
Daya Motor Utama: |
550 - 5000kW |
Kadar Air Gipsum Mentah: |
≤10% |
Kadar Air Produk: |
≤0,5% |
Area Aplikasi: |
Desulfurisasi, Metalurgi, Industri Kimia, Kekuasaan, Energi Baru |
Instalasi: |
Panduan Insinyur |
Peringkat Daya (kW): |
110-400kW |
Bahan yang cocok: |
Gipsum Alami、FGD Gipsum、Phosphogypsum、Citrogypsum |
Specifications And Technical Parameters Of HVM Gypsum Vertical Mill
| Model | HVM2500 | HVM2800 | HVM3400 | HVM3700 | HVM4200 | HVM4500 | HVM4800 | HVM5100 | HVM5600 |
| Grinding Table Median Diameter(mm) | 2500 | 2800 | 3400 | 3700 | 4200 | 4500 | 4800 | 5100 | 5600 |
| Capacity(t/h) | 85-100 | 130-160 | 190-240 | 240-300 | 320-400 | 400-500 | 440-550 | 550-670 | 600-730 |
| Raw Material Moisture | <10% | ||||||||
| Raw Meal Fineness | R0.08<12% | R0.08<14% | |||||||
| Raw Meal Moistrue | ≤1% | ||||||||
| Main Motor Power(kW) | 800/900 | 1120/1250 | 1800/2000 | 2500/2800 | 3150/3350 | 3800/4200 | 4200/4500 | 5000/5400 | 5600/6000 |
| Illustrate | Re:Raw materials bond index≤13kWh/t | ||||||||
I. Core Working Principle
The vertical mill integrates rolling, grinding, drying, and classifying into a single operation, with
the process detailed below: Feeding & Conveying: Post-crushing lump gypsum is fed into the mill by an air-lock feeder
and lands on the rotating grinding disc’s center. Rolling & Grinding: Motor-driven grinding disc rotates to move gypsum
materials. Hydraulic system applies pressure to press grinding rollers against the material layer, crushing materials between
rollers and disc. Hot Air Drying: Hot air (from hot air furnace or industrial waste heat) enters from the mill bottom, fully
contacting crushed materials to quickly dry out moisture. Classifying & Collecting: Hot air transports dried fine powder to
the top classifier. Qualified powder (finished product) is collected via a dust collector (e.g., bag filter); unqualified coarse
powder falls back for re-grinding.
Email: margo@hfvrm.com
Website: www.verticalgrindingmills.com